Huxley 3

Once again assembly was parallelised, with work proceeding seperately on the z-axis, extruder drive and extruder hot end.

Tim at work on the Z-Axis

Extruder drive in position

The extruder drive included a number of close tolerance and friction fit parts.  Some trimming with a hobby knife was required to remove excess material.

Current state of the huxley

The extruder drive is now complete and installed.  Work continues on the z-axis and hot end.

 

This entry was posted in Blog. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *